Valves
Ball, gate, globe, check and butterfly valves in carbon steel, stainless and bronze, to the pressure class on your specification.
Valves, flanges, pipe fittings, machined assemblies and fabricated items for upstream, midstream and process operations. Supplied with material traceability, test reports and a single landed price.
Ball, gate, globe, check and butterfly valves in carbon steel, stainless and bronze, to the pressure class on your specification.
Weld neck, slip-on, blind and threaded flanges, elbows, tees, reducers and couplings, with heat number traceability.
Housings, adaptors, spools, bodies and shafts machined to tight tolerance in carbon steel, stainless, duplex and nickel alloys.
Stud bolts, nuts and gasket sets to the flange rating, coated for the service environment and supplied with certificates.
Pipe spools, support structures, skid frames and platforms, welded to a documented procedure and coated to specification.
Pump and compressor wear parts, wear rings, sleeves, bushes and shaft components made to drawing.






In oil and gas the part is only half of what you are buying. The other half is the paperwork that lets your inspector accept it. We agree the documentation package before quoting, not after the container lands.
| Material traceability | Mill certificates traceable to the heat number, matched to the item. |
|---|---|
| Dimensional | Inspection reports against the drawing, with the actual measured values. |
| Pressure testing | Hydrostatic or leak test reports on pressure-containing items. |
| NDT | Dye penetrant, magnetic particle, ultrasonic or radiographic testing where specified. |
| Welding | Procedure and welder qualification records where the drawing requires them. |
| Coating | Coating specification and thickness readings, including hot dip galvanising to AS/NZS 4680. |
Material test certificates traceable to the heat number, dimensional reports, and pressure or leak test reports on pressure-containing items. Tell us the package your specification calls for before we quote, because it affects price and lead time.
We supply against the standard nominated on your drawing, including common ASME, ASTM, API and AS standards. We will tell you plainly where a standard is outside what our partners can certify rather than take the order and disappoint you.
Stainless, duplex and nickel alloys are available. Sour service requirements such as NACE MR0175 must be stated up front since they affect material, heat treatment and testing. Send the specification and we will confirm feasibility before quoting.
Eight to twelve weeks including sea freight for machined items to existing drawings. New tooling, special alloys or witnessed testing take longer. We give a realistic programme rather than an optimistic one.
Yes. Third-party or customer witnessed inspection can be arranged at the manufacturing plant. Tell us at quotation stage so the hold points are built into the programme.